BLOG/TECHNICA

BLOG/TECHNICA

Peak carbon dioxide emissions and carbon neutrality

2026-08-06

[pin]Going Global with Strength | Our company has successfully won the bid for the Pakistan NGC 220kV Transmission Line Porcelain Insulator Project.

Our company has officially received the award notice from Pakistan’s National Grid Corporation (NGC). We have been awarded Lot I of the 100 kN fog-type disc porcelain insulators for the 220 kV double-circuit transmission line project, with tender reference number ADB-PTSP-TL-02R-2025.

View details

2026-09-22

Caring for Employee Health | High Class Organizes Annual Health Checkups for All Employees

On September 22, 2026, in order to genuinely care for employees’ health, implement corporate humanistic concern, and enable staff to promptly monitor their own health status and strengthen their health safeguards, Pingxiang High Class Insulator Co., Ltd. recently organized an annual health check-up for all employees at the Luxi County People’s Hospital. The event was centrally coordinated by the company, with examination schedules carefully staggered to ensure that everyone could complete all tests in an orderly manner.

View details

2026-09-17

The Gansu section of the Gansu–Zhejiang ±800 kV UHV DC transmission project has been fully connected.

On September 14, at the junction of Jingtai County and Jingyuan County in Baiyin City, Gansu Province, the Gansu–Zhejiang ±800 kV ultra-high-voltage direct-current transmission project (hereinafter referred to as the “Gansu–Zhejiang DC Project”) successfully completed the overhead‑line construction across the Yellow River, marking the full line connectivity of the project’s Gansu section.

View details

2026-09-09

The total length of Xinjiang’s 750-kV ultra-high-voltage transmission lines has exceeded 15,000 kilometers.

According to the State Grid Corporation of China, the total length of Xinjiang’s 750-kV ultra-high-voltage transmission lines has exceeded 15,000 kilometers, covering an area of approximately 1.6 million square kilometers and significantly enhancing the region’s capacity for transmitting clean power.

View details